NETMOC-O SWA

The work performed included a tech refresh of the identified TR’s which included installation of new dedicated power circuits and grounding for new network switch equipment.   The installations included as required in each TR condition, the placement of new cabinets, installation of new Uninterruptable Power Supplies (UPS), Power Distribution Units (PDU), cable management and patch panels as well as installation of new power panels where required.   Hyperion has at this time performed over 500 new circuit installations at Camp Arifjan and Camp Buehring in Kuwait and we are now slated to move on to Camp As Sayliyah, Qatar for the completion of the project due to complete in the June 2016 time frame.