This network was incorporated into a 100 year old building on the Historic Register. Hyperion had to comply with interior design constraints of historic preservation and building architects. This also to support existing character cell terminals, high speed workstations and 100 Mbs to the desktop.

McNeil Hall, located at 1400 Maple St., Golden, CO, is the new headquarters for Public Safety on the campus of Colorado School of Mines. Hyperion was tasked by Jeff Culligan, Telecommunications Manager, to propose a solution to enhance AT&T and Verizon cellular signal on the first floor, with a subsequent request to enhance signal coverage …

CSM McNeill Hall DAS Installation Read More »

This contract is for Hyperion to operate and maintain one NORTEL SL-100 MFS, one NORTEL SL-100 End Office Switch (EOS), one NORTEL Meridian CS-1000 Private Branch Exchange (PBX), one AVAYA AS 5300 Local Session Controller (LSC), three AVAYA G450 11C PBX, four Nortel Option 11C PBX, three Nortel Option 11C Mini PBX with all related …

NTCS Naples Voice System Operation and Maintenance Read More »

Provide Modernization of Premise Cabling infrastructure within four (4) buildings on McGuire AFB.  Premise cabling installations to include Horizontal CAT6 quad outlet drops to 80 locations in building 2705, 80 locations in building 2903, 70 locations in building 2916 and 50 locations in building 3001.  Installations to include all conduit, EMT, cable tray, j-hook and …

NETCENTS – Cabling at McGuire AFB Read More »

The work performed included a tech refresh of the identified TR’s which included installation of new dedicated power circuits and grounding for new network switch equipment.   The installations included as required in each TR condition, the placement of new cabinets, installation of new Uninterruptable Power Supplies (UPS), Power Distribution Units (PDU), cable management and patch …

NETMOC-O SWA Read More »

During the term of this contract/P.O., Hyperion has assisted Avaya with upgrading the AS5300 services from the Release 2.0 to Release 3.0 software, provisioning and deploying Voice over IP (VoIP) services to 2,000 clients, and also the UNIStim to SIP upgrades for the Avaya 1120 and 1140 IP phones. These are similar actions that will …

Hanscomb AFB AS5300 Installation Read More »

Hyperion designed, developed and implemented a Data Warehouse Application. The system is Oracle Based, three tier client server, LAN and WEB access. The system is Simple Point & Click User Interface & Total User Flexibility for Query  & Reports. It is a high speed information retrieval system system supporting world-wide operations for the U.S. Navy …

U.S. Navy International Logistics Control Office Read More »

Hyperion fielded a team of four technicians for three months to conduct various Fiber-Optics cable related installation at Patch Barracks, Stuttgart, Germany. The project also included 2km of single-mode fiber optic cable at the Marshall Center, Garmisch, Germany.

Gaithersburg, MD – Hyperion’s IDIQ contract supports the NIST Center for Neutron Research (NCNR) in the development, design, manufacture, and installation of complex systems and sub-systems in support of the NCNR facility operations and safety systems. Hyperion has completed several projects for NIST; one such project was the Installation of Cooling Tower Maintenance Platforms. For …

NIST – Cooling Tower Read More »

Hyperion was contracted by AutoZone to provide, install, and inspect all aspects of its solar installation project in Palmdale, CA. Hyperion provided all solar, racking, concrete ballasts, mechanical roof fasteners, solar rapid shutdowns, inverters, energy storage, and safety materials. Likewise, they provided all associated labor, and interconnection balance of systems equipment, including AC/D, Fuses, Meter …

AutoZone Solar Palmdale, CA Read More »